Text 2: Sunshine Skyway Bridge



Brief information:

Location: St. Petersburg and Bradenton, Florida, USA

Completion Date: 1987

Cost: $244 million

Length: 29, 040 feet

Type: Cable-Stayed

Purpose: Roadway

Materials: Steel, concrete

Longest Single Span: 1, 200 feet

Engineer(s): Figg & Muller Engineering Group

Completed in 1987, the Sunshine Skyway is the world's longest cable-stayed concrete bridge. It is probably the best known of the several dozen cable-stayed bridges that have been built in the United States since the late 1970s. Its popularity may be due to its unique color -- its cables are painted a bright taxicab yellow -- but the bridge also boasts an interesting history. The need for a lower Tampa Bay crossing can be traced back to the 1920’s when a suspension bridge was proposed. However, it met opposition from shipping interests in Tampa, who wanted a tunnel instead. All ideas of a bridge or tunnel had to be put on the shelf when World War II broke out. After World War II the idea of a bridge was resurfaced. The need for a bridge was justified due to the traffic using the Bee Line Ferry as it was the only way to get to Bradenton and points south without having to make the long drive through Tampa.

Construction began on the original Sunshine Skyway Bridge in 1950 and it was completed in 1954. The original bridge was a cantilever through-truss with a vertical clearance of 150 feet and a shipping channel clearance of 800 feet, which was adequate for ships of that era. One could admire the architecture of the major support piers on either side of the shipping channel as well as the three other support piers on the deck truss section of the bridge.

During a violent thunderstorm on the morning of May 9, 1980, the freighter Summit Venture plowed into the cantilever bridge. More than 1, 000 feet of the bridge fell into the bay, killing 35 motorists and bus passengers instantly. After the Skyway disaster there was a choice that had to be made:

Repair or replace? One side wanted the bridge repaired while the other side wanted a whole new bridge. After all, two way traffic was once again being maintained on the 1954 span. A decision was made to replace the Sunshine Skyway Bridge with a cable-stayed bridge modeled after a bridge in France. The Florida Department of Transportation began construction on a safer Sunshine Skyway Bridge only days later. More than 300 precast concrete segments were linked together with high-strength steel cables to form the roadway. Protecting the new bridge from ships was a big priority, so they installed large concrete islands, called dolphins, around each of the bridge's six piers to absorb unwanted impact.

Since it opened to traffic in 1987, the sleek, new Sunshine Skyway has won dozens of engineering and design awards.

In November 2005 the Sunshine Skyway was renamed the Bob Graham Sunshine Skyway Bridge in honor of the former Florida governor who made the right decision to replace the 1954 and 1971 cantilever spans with a new cable stayed bridge.

Fast Facts:

· The dolphins around each pier were designed to withstand the impact of an 87, 000-ton ship.

· Twenty-one steel cables support the roadway. The cables are sheathed in steel pipes, nine inches in diameter. The pipes were painted a brilliant yellow to reflect its location: the Sunshine State.

· Forty-foot-wide roadways run on either side of the cables. This design allows drivers to have unobstructed views of the water.

· Tampa is a busy shipping port. To ensure that navigation would not be blocked, engineers designed the bridge to soar 190 feet above the water.

COMPREHENSION CHECK

I. Decide whether the following statements are true or false according to the text:

1. The Sunshine Skyway is probably the best known of the several world's longest cable-stayed concrete bridges.

2. The bridge is famous because of its colour.

3. More than 300 precast steel segments were linked together with high-strength steel cables to form the roadway.

4. Large concrete islands, called dolphins, were installed to protect the new bridge from ships.

5. The pipes were painted a brilliant yellow to reflect the colour of taxicabs in the Sunshine State.

6. Forty-foot-wide roadways run on either side of the cables and the design enables drivers to have a safe moving.

7. A violent thunderstorm destroyed a four-mile steel cantilever bridge.

8. The bridge was named after Bob Graham Sunshine Skyway.

9. Engineers designed the bridge to lift apr. 200 feet above the water.

II. Answer the following questions:

1. Why is the Sunshine Skyway so popular and famous?

2. Why did building the bridge meet an opposition?

3. What was the main purpose to build the bridge after the war?

4. What can you say about the disaster in 1980?

5. What decision was made after the disaster? What would you have done if you had been a chief engineer?

6. What was the reason to use dolphins? What are they?

7. The Sunshine Skyway was renamed. After whom was it renamed? Why?

LANGUAGE FOCUS

III. Match the meanings of these terms with their definition:

 
 

 


1. a vertical structure which supports the ends of a multi-span superstructure at a location between abutments. 2. mixture of gravel, sand, cement, and water 3. underground passage dug through a hill or under a road, river, esp. for a railway or road 4. great or sudden misfortune; catastrophe 5. a structural member which projects beyond a supporting column or wall and is counterbalanced and/or supported at only one end 6. the top surface of a bridge which carries the traffic a. navigable part of a waterway b. broad curving inlet of the sea c. cast in its final stage before positioning d. amount usu. or actually carried e. hinder or neutralize by contrary action f. a harbour g. hanging, pendant h. to be in equilibrium

IV. Complete the table with the missing words:

Noun verb adjective / participle
    suspended
  to span  
  to replace  
Decision    
    supplemental
Support    
    structural
  to construct  

Choose any 6 words and make sentences with them.

V. Say in other words (use synonyms or terms instead of words and word-combinations in italics):

The Forth Railway Bridge bridges the navigable channel called the Firth of Forth. The Sunshine Skyway bridge stretches over the Tampa Bay. The former is a bridge made of cantilevers projecting from piers and connected by girders, the latter is a variation of suspension bridge in which the tension members extend from one or more towers at varying angles to carry the deck. The connecting spans of the Firth of Forth bridge, which are sustained entirely by the main horizontal structure members supporting vertical loads by resisting bending they connect, are built minimally to be as light as they can be. To say about the Sunshine Skyway construction, more than 300 concrete segments ready for use were connected together with high-strength steel thick strong metal ropes to form the part of the road used by vehicles.


Поделиться:



Популярное:

Последнее изменение этой страницы: 2016-03-16; Просмотров: 1639; Нарушение авторского права страницы


lektsia.com 2007 - 2024 год. Все материалы представленные на сайте исключительно с целью ознакомления читателями и не преследуют коммерческих целей или нарушение авторских прав! (0.015 с.)
Главная | Случайная страница | Обратная связь